WorkAlly Geospatial: ask the map
A plain question answered on satellite imagery through ARDUN, across 1,000+ spatial layers.
Data and geospatial engineering
Pipelines, warehouses, dashboards and geospatial layers that bring your business data, sensors and satellite imagery into one place, built by the lab behind ARDUN.
Data engineering is building the pipelines, storage and models that turn raw data into something people can query and trust. Geospatial engineering does the same for data with a place on Earth, from GPS traces to satellite imagery. At WEVENTURES one team does both on a monthly plan, and the pipelines, the models and the data stay yours.
How we think
We are a research-led company. Every project starts in the lab, then a senior team ships it every week.
Nothing gets built because it is an idea. It passes the lab first: the facts, the tests, the models and the forecasts. Then we ship it fast, with the right amount of perfectionism for the market it has to win.
What you get
The team
Most clients start with a Pod: a product squad that designs, builds, tests and ships every week. On 3, 6 or 12-month terms; the team changes as the work changes.
How it works
Problems we take on
Proof
The same team ships the lab’s own ventures.
A plain question answered on satellite imagery through ARDUN, across 1,000+ spatial layers.
150+ satellite assets, 30 cm best resolution and an 8 to 24-hour revisit over Saudi Arabia.
Watched areas flagged when something changes, such as a new vessel at a port.
Stack
We use what you already run when it is sound.
Compared
| Question | Hire in-house | Agency project | Freelancers | WEVENTURES |
|---|---|---|---|---|
| Time to start | Two to three months a hire | Weeks, after a long scope | Days, one person at a time | Most teams start in two weeks |
| Who manages | You | The agency, to a fixed scope | You | Our lead, with you deciding |
| Changing course | Slow: hiring and notice periods | A change request | Find someone new | Month to month, inside the term |
| Who owns the code | You | Often licensed, check the contract | Depends on each contract | You, from the first commit |
| At the end | The team stays, so does its cost | A hand-over, then you are alone | Knowledge leaves with the person | A clean hand-over, or we keep running it |
Questions
Start a project
A few short questions. The answers go straight to the people who would build it.
What should the team build, in a line or two?